The ball sports complex is characterised by a clear layout and optimal orientation, sustainable energy and material use, and flexibility wherever possible. The ground floor accommodates two large sports halls and associated facilities such as changing rooms and storage areas. The upper floor contains a cafeteria overlooking the sports halls, as well as multipurpose spaces. The central volume containing all the supporting functions of the sports halls is designed to be as transparent as possible. Daylight penetrates deep into the centre of the building through the front façade and several rooflights.
Ralph Kieft (partner/architect, ZJA): “By opting for a modular, exposed load-bearing structure and honest, circular materials, the sports complex has an inviting, distinctive and sustainable appearance. Using timber as the primary material gives the building a natural character within the park, while a robust, impact-resistant brick plinth made from Boom clay connects it to the other buildings in the park. Inside, the structure will remain exposed, the communal spaces will have a spacious and warm atmosphere, and visitors will have excellent views of the activities taking place in the sports halls from the public areas.”