Project

Albert Cuyp underwater parking garage, Amsterdam

Parking underneath a canal

The Albert Cuyp underwater parking garage reveals almost nothing at street level as it is completely concealed under an existing canal to blend into the urban landscape. Almost all parking places at street level in the immediate surroundings have been removed and relocated to the parking garage. The former parking areas have been redesigned to create more public space for new playgrounds, plants and squares.

Liveability in the Pijp neighbourhood

The neighbourhood De Pijp in Amsterdam was built during the last decades of the nineteenth century and was not designed to accommodate a large quantity of cars. In the sixties and seventies people even used to park their cars on the side walks of the narrow streets. The city had to honour contradictory wishes. Residents did not want to give up their cars, but also wanted a neighbourhood that offered a comfortable atmosphere with enough opportunities to play outside and go for an unobstructed stroll.

One-way streets, new expensive parking facilities and strict traffic control improved the situation somewhat. But a significant reduction in cars crowding the streets of De Pijp is only now achieved with the new Albert Cuyp parking garage underneath the water of the Boerenwetering, between the Ruysdaelkade and the Hobbemakade, designed by ZJA Architects & Engineers. There have been fantasies about it for a long time, but this is now the first parking garage built under the water of an Amsterdam canal.

A long and well-organised parking garage

Sixty of the 600 parking places in the underground garage are reserved for visitors of the neighbourhood, the remaining are for residents of De Pijp who have a parking permit. Because a great number of parking places  are disappearing in the neighbourhood, more space will become available for planting, squares and playing areas. The garage will also provide parking for 60 bicycles. For pedestrians, cyclists and playing children, the neighbourhood will vastly improve.

To house that many vehicles, two levels of parking space over a length of 260 meters are needed. Access and exit have to be easy and transparent in such a long and narrow space. For this, long ramps against the outsides provide straightforward and one-way traffic. To use the width of the garage as efficiently as possible the cars are parked under a 70-degree angle. Also the oval columns are placed under the same angle. This gives passing by on foot or by car a lively and rhythmical visual effect.

The cobalt blue way finding in lines and pictograms also supports this, making sure that orientation is quick and easy. The ceilings are smooth as most of all cables and ducts are incorporated in the concrete, providing a quiet and transparent feeling. There are no shady corners in this garage. The glass pedestrian entrances and the long ramps allow maximum daylight to enter into the garage, which contributes to a feeling of safety and pleasantness.

Underground parking, more space above ground

The idea behind this design by ZJA is to blend the parking garage into the existing urban landscape. All installations are installed out of sight as best as possible and the ramps are integrated into the existing quays without any conspicuous elevations. The motto is: simple and safe, visually as unobtrusive as can be, to keep the quality of the public space for pedestrians and cyclists optimal. That is why the entrances and elevators are modest in size and as transparent as possible. Because the parking system in this garage remembers which license plate is parked in which slot, it qualifies as a smart garage. However, the real intelligence in this parking garage is hidden in the fact that not a square foot of city has been sacrificed to house 600 cars so that the residents and visitors of De Pijp can enjoy more spacious, greener and quieter streets.

Awards
Winner: D
utch Concrete Award 2019, Jury prize Architizer A+Awards 2019, Award of Excellence for Architectural Achievement 2019, ESPA Gold Award 2018.
Nomination: WAN Transport Award 2019

Architect: ZJA Architects & Engineers
Client: Stadsdeel Zuid, The Municipality of Amsterdam

Contractor: Max Bögl Nederland B.V.
Subcontractors Max Bögl: Volker Staal en Funderingen, ABT, Beens Groep , De Vries & van de Wiel, Proton Bau, DCN, Van Velzen, Van Dorp Installaties, Van Haastere B.V. 
Design Engineer: Van Rossum
Geo Engineering: CRUX
Year: 2018

Photos: Jeroen Musch, Thomas Slijper, ZJA

Project: #754

 

Related

Project

Eurostar UK Terminal Amsterdam Centraal

Brand-new terminal in monumental station

The opening of the new Eurostar UK Terminal at Amsterdam Central Station marks an important step in the development of international rail…

Read more
Project

Oosterweelconnection Right Bank, Antwerp

The Ring and the city

The objective of the major reconstruction of the Antwerp Ring Road is to close the ring and roof it over as much as possible, in order to…

Read more
Project

Oosterweelconnection Left Bank, Antwerp

Space for traffic and landscape

The Oosterweel Link on Antwerp’s Left Bank renews the Ring with new interchanges, flyovers, cycle bridges and underpasses. ZJA Architects…

Read more
Project

Zuidasdok, Amsterdam

Where the city is bursting at the seams

Zuidasdok is one of the largest infrastructure projects in the Netherlands. It includes the renovation and expansion of Amsterdam South…

Read more